• Latest
  • Trending
  • All
  • News
  • Politics
  • Lifestyle
After 20-Hour Gridlock, FG Suspends Lagos-Ibadan Expressway Bridge Construction

After 20-Hour Gridlock, FG Suspends Lagos-Ibadan Expressway Bridge Construction

November 20, 2026
BREAKING: Fountain of Life Church Removes Jimmy Odukoya as Senior Pastor

Court Restrains Jimmy Odukoya From Parading Himself as Fountain of Life Church Senior Pastor

November 20, 2026
IGP Disu Directs Hospitals to Treat Gunshot Victims Without Police Reports

IGP Disu Directs Hospitals to Treat Gunshot Victims Without Police Reports

November 20, 2026
Vote For My Husband In 2027, I Want To Enjoy Nigeria At Old Age — Remi Tinubu

Remi Tinubu Seeks N70bn to Complete National Library

November 19, 2026
2027: Court Upholds Yahaya Bello’s APC Ticket in Kogi Central

2027: Court Upholds Yahaya Bello’s APC Ticket in Kogi Central

November 19, 2026
  • About Us
  • Contact Us
  • Privacy Policy
  • Adverts
Friday, November 20, 2026
  • Login
Kemi Ashefon Love Haven
  • News
  • Dear Kemi
  • Intimacy
  • Politics
  • Entertainment
  • Lifestyle
  • Tech
  • Sport
No Result
View All Result
  • News
  • Dear Kemi
  • Intimacy
  • Politics
  • Entertainment
  • Lifestyle
  • Tech
  • Sport
No Result
View All Result
Kemi Ashefon Love Haven
No Result
View All Result
ADVERTISEMENT
Home Metro

After 20-Hour Gridlock, FG Suspends Lagos-Ibadan Expressway Bridge Construction

Ayobami Owolabi by Ayobami Owolabi
8 minutes ago
in Metro
Reading Time: 5 mins read
0
After 20-Hour Gridlock, FG Suspends Lagos-Ibadan Expressway Bridge Construction
491
SHARES
1.4k
VIEWS
Share on FacebookShare on Twitter

The Federal Government has halted the construction of a pedestrian bridge at Aseese on the Lagos-Ibadan Expressway following a massive traffic congestion that kept motorists and commuters stranded for more than 20 hours.

The project, being handled by the Federal Ministry of Works in partnership with CBC Construction Company, was scheduled to take place between Wednesday, November 18, and Sunday, November 22, as part of efforts to install the pedestrian bridge.

Before the exercise began, the Ogun State Traffic Compliance and Enforcement Agency (TRACE) announced that inbound traffic heading towards Lagos would be temporarily diverted onto the Lagos carriageway at Aseese. Motorists were expected to return to their regular route through an exit point opposite Christ Embassy.

However, the traffic arrangement resulted in severe congestion, which started around 2pm on Wednesday and continued until about noon on Thursday.

Hundreds of motorists and commuters were caught in the gridlock for several hours, forcing many to abandon their vehicles and trek to their destinations.

Some passengers who left Ibadan shortly after 11am reportedly did not reach Magboro until about 5.30pm. Another motorist said the journey from Mowe to Magboro took him eight hours.

Commercial motorcycle operators reportedly exploited the situation by increasing their fares. One rider allegedly demanded N6,000 from a passenger travelling from Mowe to Ibafo.

The congestion was also aggravated by motorists driving against traffic in an attempt to escape the long queue.

Reacting to the situation on Wednesday night, Sunday Dare, Special Adviser to President Bola Tinubu on Media and Communications, questioned the decision to carry out the construction during busy traffic hours.

In a Facebook post, Dare said he had spent more than five hours trapped in the congestion while travelling from Lagos to Ibadan for scheduled radio and television appearances ahead of the APC presidential rally slated for Saturday in the Oyo State capital.

READ ALSO:

  • Court Restrains Jimmy Odukoya From Parading Himself as Fountain of Life Church Senior Pastor
  • IGP Disu Directs Hospitals to Treat Gunshot Victims Without Police Reports
  • After 20-Hour Gridlock, FG Suspends Lagos-Ibadan Expressway Bridge Construction
  • Remi Tinubu Seeks N70bn to Complete National Library
  • 2027: Court Upholds Yahaya Bello’s APC Ticket in Kogi Central

He expressed concern that thousands of commuters had been stranded, with some abandoning their vehicles to continue their journeys on foot.

Dare wrote, “Tonight – Lagos -Ibadan Expressway. I have been in a traffic gridlock for over five hours trying to get out of Lagos to Ibadan for multiple radio and television appearances ahead of the APC Presidential Rally coming up on Saturday in Ibadan.

“It beats me why a Chinese Contractor would choose the busiest hours of vehicular traffic to construct the bridge and road around this exit point. Stranded cars, thousands of people trekking to get home.

“What happened to doing construction work during the obituary hours when traffic is lean? This is unnecessary pain. It needs to be corrected.”

Several other road users also took to social media to recount their experiences during the traffic crisis.

A Facebook user, Adiatu Adeoye, said her truck was trapped in the congestion for 12 hours.

Another user, Ojewale Adewale, described his experience, writing, “Got to Interchange from Abeokuta enroute Lagos by 3pm, I am just getting home now 9.59pm.”

Kemi Adewuyi also narrated how she encountered the traffic on her way from work on Wednesday and again while travelling to work on Thursday morning.

She wrote, “I met the traffic yesterday afternoon on my way from work, still met it this morning on my way to work, it was terrible. Imagine paying N500 from car park C to Mowe bus stop this morning.”

When our correspondent monitored the situation on Thursday, the congestion was still ongoing, having persisted overnight and into the afternoon.

Some commuters reportedly abandoned their journeys after commercial drivers increased fares from the usual N700 to N800 to as much as N3,000 for trips between Mowe and Berger.

Commercial motorcyclists also raised their charges to about N5,000 for the same journey.

By around noon on Thursday, however, traffic had eased and vehicles were moving freely along the affected section of the expressway.

Following the disruption, TRACE announced an indefinite suspension of the construction activities and the associated traffic diversion.

The agency said the decision was taken after reviewing the difficulties experienced by motorists along the route from Wednesday to Thursday morning.

Its spokesperson, Babatunde Akinbiyi, said the temporary traffic arrangement had been suspended until further instructions from the relevant authorities.

“Consequently, all motorists are hereby advised that the temporary traffic diversion associated with the pedestrian bridge construction is suspended, pending further directives from the relevant authorities.

“TRACE regrets the inconveniences, delays and discomfort this development may have caused motorists and other road users. We sincerely appreciate the patience, understanding and cooperation of the motoring public,” he stated.

The acting Controller of the Federal Ministry of Works in Ogun State, Richard Adeleye, also confirmed the suspension when contacted on Thursday.

“Yes, it was suspended due to the traffic situation,” Adeleye told our correspondent during a telephone conversation.

Meanwhile, some commuters have called on the Ogun State Government to rehabilitate inner roads connecting to the expressway to provide alternative routes whenever major traffic disruptions occur.

One of them, Kunle Adeleke, said motorists could have avoided much of the suffering if the adjoining roads were in good condition.

“If the inner roads are good, they would have served as the alternative routes for motorists during traffic situation. Ogun State Government should fix the inner roads and end this gridlock suffering every time,” he said.

Another commuter, Jamiu Akinsola, urged the Federal Government to strengthen its supervision of contractors working on major highways to prevent similar incidents.

He acknowledged the importance of infrastructure projects but stressed that the welfare of road users should be considered during construction.

“Infrastructural development is good but the welfare of the people must be taking into consideration.

“The FG must call its contractors to order and inform them to put the wellbeing of the citizens first. We should be doing better than these at this stage of our national development,” he said.

Tags: Lagos StateLagos-Ibadan Expressway
Kemi Ashefon Love Haven

Copyright © 2024 Kemi Ashefon Love Haven.

Navigate Site

  • About Us
  • Privacy Policy
  • Cookie Policy
  • Contact Us

Follow Us

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • About Us
  • Privacy Policy
  • Cookie Policy
  • Contact Us

Copyright © 2024 Kemi Ashefon Love Haven.